111 Hillcrest, Phase 1 and 2.
Location: San Diego, CA.
Phase 1 Start: July, 2019.
Phase 1 Completion: November, 2019.
Description: Stand-alone parking structure for the adjacent AT&T Operations Center. Two levels of above grade parking on top of three levels of subterranean parking.
Phase 2 Start: April, 2020.
Phase 2 Completion: January, 2021.
Description: 111-unit podium style multifamily residential. 4 Levels of elevated structural concrete slab, with 3 levels below grade.
Overland Apartments
Location: Los Angeles, CA.
Start: July, 2019.
Completion: November, 2019.
Description: 41-unit podium style multifamily residential with two elevated slabs. One level of subterranean parking and one level of above grade parking.
Kenmore Co-Living
Start: May, 2020.
Completion: September, 2020.
Description: 30-suite podium style co-living residential with one elevated slab.