111 Hillcrest, Phase 1 and 2.

Hillcrest 111 Rendering.jpg

Location: San Diego, CA.

Phase 1 Start: July, 2019.

Phase 1 Completion: November, 2019.

Description: Stand-alone parking structure for the adjacent AT&T Operations Center. Two levels of above grade parking on top of three levels of subterranean parking.

Phase 2 Start: April, 2020.

Phase 2 Completion: January, 2021.

Description: 111-unit podium style multifamily residential. 4 Levels of elevated structural concrete slab, with 3 levels below grade.

Overland Apartments

Location: Los Angeles, CA.

Start: July, 2019.

Completion: November, 2019.

Description: 41-unit podium style multifamily residential with two elevated slabs. One level of subterranean parking and one level of above grade parking.

Kenmore Co-Living

Start: May, 2020.

Completion: September, 2020.

Description: 30-suite podium style co-living residential with one elevated slab.